Passes 32 of 34 checks in Minneapolis in December, with 2 critical failures.
The kit contains 3 × Rich Solar MEGA 100 (RS-M100) and 1 × Rich Solar BRAVO 40 40A (RS-MPPT40P / RS-MPPT40PB). The maker does not publish how the panels are wired, so we check the layout a 12 V controller can start on with the fewest panels in series: 1 in series × 3 strings. It ships without a battery, so the year below adds 2 × Battle Born Batteries BB10012 100Ah 12V LiFePO4 from the catalog; checks about that battery are listed separately and do not count against the kit.
What fails, and where
Phoenix (warm, December): 32 of 34 pass
- Damages hardware
The kit has no battery fuse, and without one it's a fire hazard.
Show the numbers
No battery fuse in the kit. It is not optional.Sources: ABYC E-11 - Damages hardware
The cable in the kit is too thin.
Show the numbers
The kit ships 8 ; this length and current need 6 AWG.Sources: ABYC E-11
Denver (moderate, December) and Minneapolis (cold, December): 32 of 34 pass
- Damages hardware
The kit has no battery fuse, and without one it's a fire hazard.
Show the numbers
No battery fuse in the kit. It is not optional.Sources: ABYC E-11 - Damages hardware
The cable in the kit is too thin.
Show the numbers
The kit ships 8 AWG; this length and current need 6 AWG.Sources: ABYC E-11
About the battery added for the simulation: The batteries stop charging in the cold and need heating.
A year with this kit in three climates
Across the nine runs the same kit goes from no blackouts (van in Phoenix) to 357 days without power (cabin in Minneapolis). The hardware is identical in every run. Only the weather and the load change, so a review from one location says little about yours.
| Use | Phoenix, AZ (warm) | Denver, CO (moderate) | Minneapolis, MN (cold) |
|---|---|---|---|
| VanWeekend van, 400 Wh a day | no blackouts | no blackouts | 69 days without powerfirst 11 Jan, longest 34 days |
| CabinYear-round cabin, 1,697 Wh a day | 351 days without powerfirst 5 Jan, longest 231 days | 348 days without powerfirst 4 Jan, longest 106 days | 357 days without powerfirst 2 Jan, longest 257 days |
| GarageGarage backup, 453 Wh a day | no blackouts | no blackouts | 46 days without powerfirst 13 Jan, longest 15 days |
What to add so it passes in the cold
As an Amazon Associate and through direct retailer programs, this site earns from qualifying purchases — see how.
Changes: Battery → Battle Born Batteries BB10012H 100Ah 12V LiFePO4 Heated (self-heating, charges in the cold).
| Part | Why | Qty | Buy |
|---|---|---|---|
| Battle Born Batteries BB10012H 100Ah 12V LiFePO4 Heated100 Ah lifepo4, self-heatingreplaces the kit part | 200 A continuous in total. | 2 | Search |
| Cable 8 AWG, 8.8 mpanels to controller, red + black, 4 m run | 17.3 A × 1.56 = 27.1 A; 1.4 % drop at 18.6 V string voltage. | 8.8 m | Search |
| Fuse 50 A + holdercontroller to battery | 1.25 × 40 A = 50 A, and no more than the wire's 60 A. Class T because lithium short-circuit current exceeds what ANL can break. | 1 | Search |
| Lugs 10 AWGstud size to match the terminals | One per cable end. | 4 | Search |
| Heat-shrink for 10 AWG lugs | One per lug. | 4 | Search |
| Battery monitor shuntrated for the largest load | Measures what goes in and out of the bank. | 1 | Search |
Kits that pass more checks
- Renogy 400W 12V Complete Solar Panel Kit with 2.4kWh AGM Batteries 34 of 34 pass, 0 critical
- EcoFlow DELTA 2 Max Solar Generator PV400W (D2M-400SP-1) 33 of 34 pass, 0 critical
- EcoFlow DELTA 3 Plus Solar Generator (With 160W Solar Panel) 33 of 34 pass, 0 critical
How this page was computed
Every compatibility rule the checker has runs against the kit in the worst solar month of each city. The year is simulated hour by hour with the listed loads; parts to add come from the auto-fix and the computed parts list.
- Kit contents from the manufacturer verified 2026-09-16
- NREL PVWatts v8 typical weather years Phoenix, Denver, Minneapolis; fetched 15 September 2026
The formulas are the same open engine the checker runs; the methodology page lists every constant.
These results are for reference. Wiring must be installed by a qualified electrician. Mobile installations follow ABYC E-11; stationary ones NEC 690/706.